What's NewTendersLatest Discussion TopicsEvents

TEC is in the process of finalizing its Annual Action Plan for 2017-18

TEC is in the process of finalizing its Annual Action Plan for 2017-18′ This plan has to be drawn up in pursuance of the role of TEC in helping the telecom industry in formulating various standa... »

TEC portal for Online Sale of Documents

The TEC portal for Online Sale of Documents (https://epurchase-tec.gov.in) have been launched on 19th October, 2016. (click here)  Around 500 documents prepared by TEC by way of Generic Requirements (... »

Member (Technology) DoT inaugurated the TEC portal of Online Sale of Documents

Member (Technology) DoT, Mr G. K. Upadhyay inaugurated on 19th October 2016, the new TEC portal for Online Sale of Documents in TEC conference hall (click here).  TEC prepares documents by way of Gene... »

Inviting Sealed Quotations for Printing of TEC Newsletters

Sealed quotations are invited by TEC for printing of TEC Newsletters on quarterly basis for one year (click here). »

Open forum to discuss the CPE Lab Tender Document

A Customer Premises Equipments (CPE) Lab is being setup in Telecom Engineering Centre. A tender was floated recently for this project, and now the tender document is under review (click here) »

Inviting Sealed Quotations for Printing of TEC Newsletters

Sealed quotations are invited by TEC for printing of TEC Newsletters on quarterly basis for one year (click here) »

Formation of Manufacturers Forum – Future Network Division

FN Division TEC is in the process of forming” Manufacturers Forum”for formulation of lRs/GRs under its mandate / jurisdiction (click here) »

Open Forum for review of router procurement tender document

It is proposed to discuss the tender document for Procurement of Routers and associated materials for  interconnecting RTECs for remote testing with NGN Labs in an Open forum to be held on 29th June 2... »

Open forum to discuss the security test lab tender document

“It is proposed to discuss the tender document of Security Test Labs in an Open forum to be held on 10th June 2016 from 1100 hrs onward in “SAMWAD” committee room 3rd Floor TEC New D... »

TEC is in the process of finalizing its Annual Action Plan 2016-2017

TEC is in the process of finalizing its Annual Action Plan 2016-2017. This plan has to be drawn up in pursuance of the role of TEC in helping the telecom industry in formulating various standards and ... »

Page 1 of 3123

Sealed quotations are invited by TEC for printing Grah Patrika

Sealed quotations are invited by TEC for printing of 400 Grah Patrika Sancharika (click here) »

Inviting Sealed Quotations for Hiring of Audio Conference Bridge Services

Sealed quotations are invited by TEC for Hiring of Audio Conference Bridge Services for conducting Audio-Conferencing Conversations and sharing of documents, among the officers of TEC and other partic... »

Tender for Development and Commissioning of the Software for Online Collection of Test Fee

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Reputed, Experienced and financially sound IT companies for Development and Commissioning o... »

Inviting Sealed Quotations for Printing of TEC Newsletters

Sealed quotations are invited by TEC for printing of TEC Newsletters on quarterly basis for one year (click here). »

Open forum to discuss the CPE Lab Tender Document

A Customer Premises Equipments (CPE) Lab is being setup in Telecom Engineering Centre. A tender was floated recently for this project, and now the tender document is under review (click here) »

Inviting Sealed Quotations for Printing of TEC Newsletters

Sealed quotations are invited by TEC for printing of TEC Newsletters on quarterly basis for one year (click here) »

Tenders for Supply, Installation and Commissioning of Passive LAN Infrastructure

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Reputed, Experienced and financially sound IT/Networking/System Integrator companies for Su... »

Open Forum for review of router procurement tender document

It is proposed to discuss the tender document for Procurement of Routers and associated materials for  interconnecting RTECs for remote testing with NGN Labs in an Open forum to be held on 29th June 2... »

Tender document for Purchase of Stationary and other Items for TEC

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Reputed Firms/Companies for Procurement of Stationery and other Items (click here) »

Open forum to discuss the security test lab tender document

“It is proposed to discuss the tender document of Security Test Labs in an Open forum to be held on 10th June 2016 from 1100 hrs onward in “SAMWAD” committee room 3rd Floor TEC New D... »

Page 1 of 3123

Oh bother! No topics were found here!

  • It is proposed to hold the DCC meeting of Transmission Division on 18th of November, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. Non-Zero Dispersion Shifted Optical fibre cable (G.655 fibre), TEC/GR/TX/OFC-007/03/xxx-15

     2. High Precision Cleaver for Ribbon Optical Fibre, TEC/GR/TX/OCR-001/03/xxx-15

    3. Hot Jacket Remover for Ribbon Optical Fibre, TEC/GR/TX/OJR-001/03/xxx-15

     

  • It is proposed to hold the DCC Meeting of “IT” division on 29th of October, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. GR on Data Storage

  • It is proposed to hold the DCC meeting of TWA Division on 15th of October, 2015 in Old Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 14.00 PM to discuss the  following GR/IRs:

     1. IR on USIM Rel.8 for LTE network including ISIM, No. TEC/IR/WS/USIMLTE-001/01 DRAFT SEP 2015

     2. GR on Subscriber Identity Module, No. TEC/GR/WS/SIM-001/04 DRAFT SEP 2015

  • It is proposed to hold the Manufacturer Forum meeting of TWA Division on 07th of October, 2015 in Old Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 14.00 PM to discuss the  following GR/IRs:

     1. IR on USIM Rel.8 for LTE network including ISIM, No. TEC/IR/WS/USIMLTE-001/01 DRAFT SEP 2015

     2. GR on Subscriber Identity Module, No. TEC/GR/WS/SIM-001/04 DRAFT SEP 2015

  • It is proposed to hold the DCC Meeting of “IT” division on 15th of September, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. SD on IP Interconnect

     2. GR on NMS

  • It is proposed to hold the joint Sub DCC and Manufacturers Forum Meeting of “FA” division on 14th of September, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 14.30 PM to discuss the  following GR/IRs:

     (i) Lithium Ion Battery for telecom application‘(No. TEC/GR/Tx/Li-ion-01/01.MMM.YYYY.

    (ii) Point Of Sales (POS) Terminal with PSTN/CDMA/GSM/GPRS Interface (No. TEC/IR/ POS-01/04.JAN2005).

    (iii) Conference Facility Device (IR No. TEC/IR/ CON-01/02.MAY 2004).
  • It is proposed to hold the DCC Meeting of “NGS” division on 14th of September, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. Signalling Transfer Point (STP)

     2. ENUM Server

  • It is proposed to hold the Sub DCC and Manufacturers Forum Meeting of “NGS” division on 21st  of August, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. Old GR on enum server  No : TEC/GR/SA/ENM-001/01 MAR 2010

     2. Old GR on stp server No : TEC/GR/SW/STP-001/03. November.2011

  • It is proposed to hold the Sub DCC and Manufacturers Forum Meeting of “IT” division on 13th of August, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. SD on IP Interconnect

     2. GR on NMS

  • It is proposed to hold a Sub-DCC and Manufacturers’ forum meeting jointly on4thAugust’2015at 11.00 AM in the New Committee Room, 3rd Floor, TEC, New Delhi to discuss the following draft GRs: 

    1. Ethernet Traffic Analyzer (Table Top Model) for Ethernet Transport Service-Testing (GR No. GR/ETA-05/01.DEC.2007)
    2. High Precision Cleaver for Ribbon Optical Fibre (GR No. GR/OCR-01/02. DEC 2007)
    3. Hot Jacket Remover for Ribbon Optical Fibre (GR No. GR/OJR-01/02. DEC 2007)
  • DCC (Development Coordination Committee) meeting of  ‘NGS Division’ is   scheduled to be held on    02 JULY 2015  at 11:00 Hrs in Old  Committee   Room, 3rd Floor, TEC, K. L. Bhawan, Janpath, New Delhi to review the following documents of  Next Generation Switching Division. 

    (1) GR on IP Terminal (no. TEC/GR/SW/TER-IP/03/Jun 2015)

    (2) IR on IP Terminal (no. TEC/GR/SW/TER-IP/01/ Jun 2015)  

  • DCC Sub – Committee and Manufacturer Forum Meeting of FA division to be held on 30.06.2015 at 11.00 Hrs. at Old Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi to discuss the following documens

    1.‘‘Solar Photo Voltaic (SPV) Power Supply For  Fixed Wireless Terminals & Similar Systems (No.TEC/GR/SPV-02/04 MMM YYYY(Supersedes GR No. TEC/GR/SPV-02/03 MAY 2008)) ”.

    2. New GR on ‘Lithium Iron Battery for telecom application‘ (No. TEC/GR/Tx/Li-ion-01/01.MMM.YYYY.

1 2