|
Dated: 12-03-2008
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Information Technoloty
Date of Meeting : 20-03-2008
DCC
meeting of 'Information Technology Division' is scheduled to be held on
20-03-2008 at 10:30 hrs in old committee room, 3rd floor,
TEC, to discuss the following GR's/IR's/SD's.
i) Service
Requirements for IPTV
ii) GR on Data Architecture and
Components
iii) IR on Cor Router
iv) GR on Narrowband Remote Access Server
v) IR on Remote Access Server
vi) Proposed amendment on International Private Leased Circuits
Transfer Lawful Interception &
Monitoring System (IPLC-LIMS)
Dated: 10-03-2008
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Switching
Date of Meeting : 19-03-2008
DCC meeting of 'Switching Division' on 19-03-2008
(Wednesday) at 10:30 hrs in old committee room, 3rd floor,
TEC, to discuss the following GR's/IR's/SD's.
i) National
Standards for SIP. (New Standards)
ii) Interconnect Exchange for
NGN ( New GR)
iii) National Standards for H.248 (
SD Review)
iv) PABX ( IR Review)
Dated: 10-03-2008
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Radio
Date of Meeting : 11-03-2008
DCC meeting of 'Radio Division' on 11-03-2008 in
TEC, to discuss the following GR's/IR's/SD's.
i) 13 GHz M/W Radio
Dated: 10-03-2008
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Radio(R)
Date of Meeting : 12-03-2008
A DCC Sub-committee meeting &
Manufacturer's Forum of Radio
Division is
scheduled to be held on 12-03-2008,
to
discuss the GRs/IRs.
Dated
19-02.2008
Combined meeting of DCC-SC & Manufacturer Forum of Satellite
Division is scheduled to be held on 22-02-2008 at 11:00 Hours in old
committee room to discoss the GR's on STM-1 equipmrnts operating in Ku
band & Carrier in Carrier in C band.
-----------------------------------------------------------------------------------------------------------------------------------------
Dated
12-02.2008
Limited
Tender
for supply of original cartridges
-----------------------------------------------------------------------------------------------------------------------------------------
Dated: 08-02-2008
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Radio(R)
Date of Meeting : 15-02-2008
A DCC Sub-committee meeting &
Manufacturer's Forum of Radio
Division is
scheduled to be held on 15-02-2008,
to
discuss the GRs/IRs.
Dated: 12-12-2007
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Radio(R)
Date of Meeting : 31-12-2007
A DCC meeting of Radio
Division is
scheduled to be held on 31-12-2007 at
10.30 hrs in Old Committee Room to
discuss the GRs/IRs.
Dated: 12-12-2007
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Radio(R)
Date of Meeting : 14-12-2007
A DCC
Sub-committee meeting & Manufacturer's Forum of Radio
Division is
scheduled to be held on 14-12-2007 at
10.30 hrs in Old Committee Room to
discuss the GRs/IRs.
Dated: 06-12-2007
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Information Technology(I)
Date of Meeting : 07-12-2007
A DCC Sub-committee meeting of Information
Technology Division is
scheduled to be held on 07-12-2007 at
10.30 hrs in Old Committee Room to
discuss the GRs/IRs.
Dated 06-12-2007
The Compendium on NGN may be purchased from TEC & all RTECs.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Dated: 22-11-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Switching(S)
Date of Meeting : 13-12-2007 &14-12-2007
A DCC meeting of Switching Division is
scheduled to be held on 13-12-2007 &14-12-2007
at10.30 hrs in Old Committee Room to
discuss the following GRs/IRs:
- Interconnect Exchange (GR/IEX-01/01)
- IMS TISPAN
Architecture (GR/IMS TISPAN-01/01)
- IR on EPABX
(IR/PBX-04/01)
- Trunk Media Gateway (GR/TMG-01/01)(Review)
- Service Requirements for Analogue
Subscribers (SR/ASF-01/03)(Review)
- ISDN User Network Interface (S/T)
(S/ISN-01/02) (Review)
- ISDN Basic Rate Access (U-Interface
(S/ISN-02/01) (Review)
Dated 21-11-2007
Tender
for All-in-One (Multifunction) colour Machine
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Dated
14-11-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Tender
for Data Entry Operators.
Dated: 31-10-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
TEC
Report on Spectral Efficiency
Report
Annexure
II (Concept Paper on Spectrum Efficiency)
Annexure
III (Capacity Enhancement Techniques)
Annexure
IV (Feedback)
Annexure
V A (Presentation Spectrum Efficiency on 24.08.07)
Annexure
V B ( Presentation - COAI 08.10.07)
Annexure
VI (Presentation - AUSPI 17.10.07)
Annexure
XI (Calculation Process Flow)
Annexure
XII (S-Shaped Teledensity Growth)
Annexure
XIII A (Subscribers nos. Summary)
Annexure
XIII B (Subscriber Base Criterion)
Annexure
29.10.07
Annexure
IX 23.10.07
Annexure
X 23.10.07
Annexure
VIIA 10.10.07
Annexure
VII B 11.10.07
Annexure
VIII 17.10.07
Spectrum Sheets : Metro
Chennai
Delhi
Kolkata
Spectrum Sheets Circles
Orissa
MP
Chhatisgarh
Dated:
25-10-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Division:
Transmission
(T)
The Compendium on NGN, prepared by
TEC, DoT, was released by Thiru. A. Raja, Hon'ble MoC, on 03.10.2007.
Dated: 19-10-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Satellite(SAT)
Date of Meeting : 31-10-2007
A combined meeting of DCC Sub-committee and
Manufacturer's Forum of Satellite Division is scheduled to be held on
31.10.2007 at10.30 hrs in Old Committee Room to
discuss the following GRs:
a) 1 m earth station antenna operating in Ku-band
b) 1.2 m earth station antenna operating in C-band
c) 3.8 m earth station antenna operating in Ku-band
Dated: 5-10-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
1. Feedback
format for
calculation of Spectrum Efficiency is available.
Inputs/Comments/feedback invited by October 8, 2007.
Dated: 4-10-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
1. The Compendium on
NGN, prepared by TEC, DoT, was released by Thiru A. Raja, Hon'ble
MoC&IT, in a function held on 3.10.2007 at e-Governance Hall,
Electronics Niketan, CGO Complex, New Delhi.
Dated: 03-10-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
1. Shri Udit Narain Bajpayi
is posted as DDG, Fixed Line Access (FLA). He will be the incharge of
PON, External Plant and Power Plant.
2. Shri H. K. Gupta
is posted as DDG, NGN Co-ordination (NC). He will be the incharg of NGN
Lab Co-ordination, IPv6, National Focus Group NGN ( NFG-NGN), Numbering
Plan and related issues.
Dated: 24-09-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Transmission(T)
Date of Meeting : 28-09-2007
DCC meeting for review of GRs/IRs is
to be held on 28.09.2007 from
10.30 to 17.00 hrs at New Committee Room.
Dated: 20-09-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Mobile(M)
A presentation was
made by TEC on 'Spectrum Efficiency for Mobile Services' on 24-08-2007.
The following related
documents are available:
1.
Concept
paper on “Spectral Efficiency”
2.
Study
paper on “Optimizing Spectrum Utilization”
3.
PowerPoint
presentation.
4.
Feedback
format for spectrum
Dated: 26-07-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Radio(R)
• Spectrum
Management : WRC-2007 of ITU
Dated: 18-09-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Radio(R)
Date of Meeting : 21-09-2007
Session-I
10.30 to 13.00 hrs
DCC meeting for review of GRs/IRs is
to be held on 21.09.2007.
Session-II
14.30 to 17.00 hrs
Disaster Management ( with reference to telecom )
Dated: 28-08-2007
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Information Technology(I)
Date of Meeting : 31-08-2007
DCC Sub-committee meeting for review
of GRs/IRs is
to be held on 31.08.2007.
Dated:
23-08-2007
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Information Technology(I)
Date of Presention : 29-08-2007
Technical Presentation by
M/s Krysalis on RADHA PILLAI SPECTRUM TECHNOLOGY. (click here for detail)
Dated: 23-08-2007
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Division: Satellite(SAT)
Date of Meeting : 31-08-2007
DCC meeting for review of GRs/IRs is
to be held on 31.08.2007.
Dated:
24-08-2007
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Division:Mobile(M)
Date of Presention : 24-08-2007
Technical
Presentation on "Spectrum Efficiency for Mobile Telephony Services" on
August 24, 2007 at 15.00 hrs.
Dated: 22-07-2007
---------------------------------------------------------------------------------------------
---------------------------------------------------------------------
Division:
Radio(R)
Date of Presention : 23-08-2007
Technical Presentation by M/s Gigabeam
Inc. (USA). (click here for detail)
Dated: 13-07-2007
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Division:
Switching(S)
Date of Meeting : 25-07-2007
and 26-07-2007
DCC meeting to discuss TEC Draft on
following GRs is
scheduled to be held on 25-07-2007 and 26-07-2007 from 10.30 Hrs
to 17.30
Hrs in Old Committee Room, 3rd floor, K. L. Bhawan , TEC, New Delhi.
1.
Element Management System (GR/EMS-01/01)
2. SIP Application Server (GR/SAS-01/01)
3. Service Descriptoin for NGN Subscribers (SR/NSF-01/01)
4. Session Border Controller (GR/SBC-01/02)
5. Line media Gateway (GR/LMG-01/02)
6. Digital Exchange with STM-1 Interface (IR/PNI-04/01)
7. Digital Exchange with 2048 Kbps Interface (IR/PNI-05/01)
8. Softswitch for Local and Transit Applications
(GR/LTS-01)
Dated: 02-07-2007
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1.
Framing
of Guidelines for Disaster Management ( with reference to
Telecommunications).
2. Framing
of Guidelines for Complying with Limits for Hunan Exposure to
Electromagnatic Fields.
Dated: 20-06-2007
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Division:
Switching(S)
Date of Meeting : 27-06-2007
DCC Sub-committee cum Manufacturer's meeting to discuss TEC Draft is
scheduled to be held on 27-06-2007 (Wednesday) from 10.00 Hrs to 17.00
Hrs in Teletorium, 3rd floor, K. L. Bhawan , TEC, New Delhi. (click here for
detail)
Dated: 05-06-2007
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Study
paper on Scalable OFDMA.
Dated: 16-08-2007
------------------------------------------------------------------------------------------------------------------------------------------------------------------
The work allocation of 'V' Group has been
bifurcated to 'I' Groups,'M' Group and 'S' Group as given below:-
Annual Action Plan of TEC
for the Year 2007-08
|
V
Group
|
Sl. No.
|
Item
|
Existing Group
|
Current group
|
White Paper
|
Generic Reqmnts
|
Interface Reqmnts
|
Service Reqmnts
|
Test Procedure
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
A
|
Topic
|
|
|
|
|
|
|
|
1
|
Audio Conferencing
|
V
|
I
|
|
Q4
|
|
|
Q4
|
2
|
Audio Streaming
|
V
|
I
|
|
Q4
|
|
|
Q4
|
3
|
Basic rate access
U-interface
|
V
|
S
|
|
Q3
|
|
|
Q3
|
4
|
Fixed Cellular Terminal
|
V
|
M
|
|
R Q1
|
|
|
R Q1
|
5
|
Geographical Information
System for WCDMA/GSM networks
|
V
|
M
|
|
Q4
|
|
|
Q4
|
6
|
IMS (3GPP)
|
V
|
M
|
|
Q2
|
|
|
Q2
|
7
|
ISDN user network
interface (S/T)
|
V
|
S
|
|
R Q3
|
|
|
R Q3
|
8
|
Leaky Cable system for
in-building, mines and basement coverage
|
V
|
R
|
Q4
|
|
|
|
|
9
|
Location Based
Applications
|
V
|
M
|
|
R Q3
|
|
|
R Q3
|
10
|
Location Based System
|
|
M
|
|
Q3
|
|
|
Q3
|
11
|
Mobile Banking
|
V
|
I
|
|
Q4
|
|
|
Q4
|
12
|
Multi Media Messaging
Centre
|
V
|
M
|
|
R Q2
|
|
|
R Q2
|
13
|
Multimedia Broadcast
Multicast Service
|
V
|
M
|
|
Q4
|
|
|
Q4
|
14
|
Operation Support System (OSS) for GSM & UMTS
Networks
|
V
|
I
|
|
Q2
|
|
|
Q2
|
15
|
OSA/Parley Gateway
|
V
|
I
|
|
Q3
|
|
|
Q3
|
16
|
Pre-paid Top-up Service
|
V
|
M
|
|
Q1
|
|
|
Q1
|
17
|
Push-To-Talk Service
|
V | |