TEC's Posts

Tenders are invited only from Original Equipment Manufacturers or System Integrators for Setting up of Green Passport Lab Phase-I

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Original Equipment Manufacturers or System Integrators for Setting up of Green Passport Lab Phase-I at TEC New Delhi (click here for detail) »

Tenders are invited from Reputed Firms/Companies for Comprehensive Maintenance Contract for Computer Systems, Peripherals, UPSs and LAN

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Reputed Firms/Companies for Comprehensive Maintenance Contract for Computer Systems, Peripherals, UPSs and LAN at TEC New Delhi (click here for detail) »

Regarding Constitution of NWG-11 (National Working Group-11) for the study period of 2017-2020

The objective of the NWG is to contribute to ITU-T activities keeping in view of the interest of Indian Telecommunication. The broad responsibilities for NWG-11/SG-11 includes various studies related to signalling system architecture, signalling requirements and protocols, for all types of networks and technologies, future networks (FN), software‑defined networking (SDN), network function virtuali... »

Invitation for attending the 3rd meeting of the Mandatory Testing Consultative Forum (MATCOF) of IT Division of TEC

In continuation of 1st MATCOF& 2nd MATCOF meeting of IT division for Switch and Router family products, it is intimated that 3rdMATCOF meeting has been scheduled to be held for remaining products on 24.04.2018 and 25.04.2018 to discuss and finalize the draft ERs (Essential Requirements) of the following products: Sr. No. Product Category Variant Sr. No. Variant Name 1 LAN Switch 1 Multi-Protoc... »

Vacancy circular to fill up Assistant Director (AD) and Junior Telecom Office (JTO) Posts in Telecom Engineering Centre, New Delhi on deputation basis – Extention of last date to send the application

Last date to send the application to Telecom Engineering Centre, New Delhi is here by extended to 1.5.2018 (click here for detail) »

Notice for stakeholder meeting seeking inputs for Draft Indian Telecom Security Assurance requirements (ITSAR) ( Common) for Network Elements , ITSAR for IP Routers

To implement mandatory testing and certification ER are being formulated and Security requirements are a part of essential requirements which is being developed by Core divisions of TEC.Security wing, DOT has been entrusted with responsibility of developing Security requirements of each equipment. A draft ITSAR (Indian Telecom Security Assurance requirements) for IP Routers along with ITSAR (Commo... »

Inputs for Annual Action Plan of TEC for 2018-19

As per earlier letter No. dated 23-01-2018 and reminder on dated 01-03-2018, it was requested to provide the inputs for annual action plan of TEC 2018-19, however the inputs are still awaited. (click here for detail) »

Mandatory Testing Focussed Issues Meetings

The meetings on focussed issues on MTCTE are scheduled to be held during 9th April to 13th April. Invitations shall be sent to those whose nominations would have been received until 6th April 2018. Those who have not sent their queries/ issues to be discussed during this meeting may do so urgently so that the meetings remain focussed.  »

Inviting Sealed Quotations for Hiring of Audio Conference Bridge Services

Sealed quotations are invited by TEC for Hiring of Audio Conference Bridge Services for conducting Audio-Conferencing Conversations and sharing of documents, among the officers of TEC and other participants (click here for detail) »

Meeting of Stakeholders of Mandatory Testing on focussed issues

A meeting of stakeholders on MTCTE related issues was organized in TEC on 16th March 2018, which was attended in large number by representatives from Telecom OEMs, Laboratories, Manufacturers’ and Operators’ Associations etc. A presentation on MTCTE was given, copy of which is available for download here. Large number of queries raised during the meeting were replied/ clarified by TEC. During the ... »

Page 1 of 14123»