What's NewTendersLatest Discussion TopicsEvents

Standard on IP Interconnection between Service Providers networks released by TEC

TEC has released the standard for IP based interconnection between service providers networks. The standard deal with the requirements for interconnect. Traditionally telecom network interconnection w... »

S&D Division has been redesignated as IoT

The Service and Development (S&D) division  has been redesignated as Internet of Things (IoT) division »

M2M/IoT Technical reports released on 20-11-2015

Release of Technical Reports in M2M domain on 20-11-2015 (click for report) (click for photo) »

Test Procedure for Measurement of Electromagnetic Fields

• Main Test Procedure for Measurement of Electromagnetic Fields form Base Transceiver Stations (For Telecommunication Sector) OCT 2012 (click here) • Amendment of “Test Procedure for measurement of El... »

New GR on Self Supporting Mast

Telecommunication Engineering Centre (TEC) is formulating   a new GR for Self Supporting Mast as per the concept of Everything on Tower (EOT) to provide uniform cost effective solution for Broadband i... »

Budgetary Estimate invite

 A SAR Lab is proposed to be set up at RTEC, Mumbai and Project Estimate is under preparation, hence, RTEC Mumbai invites budgetary estimate from all interested parties (click here for detail) »

Inviting comments from Stakeholders to frame technical audit methodology for assessing domestic value addition under PMA

An interactive session/ meeting on said technical audit methodology has been held on 9th July (Thursday), 2015 with Stakeholders/Vendors/domestic manufacturers of those products. (click here) »

Inviting comments from Stakeholders to frame technical audit methodology for assessing domestic value addition under PMA

An interactive session/ meeting is  re-scheduled on 9th July(Thursday), 2015 with Stakeholders/Venders/including domestic manufacturers (clickhere) »

Inviting comments from Stakeholders to frame technical audit methodology for assessing domestic value addition under PMA

The Department of Information Technology, Ministry of Communication &IT, Government of India notified a policy for providing preference to domestically manufactured electronic products in Governme... »

Queries regarding accredited Labs

Queries regarding accredited Labs »

Page 2 of 3123

Tender for Hiring of Vehicle

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Reputed Firms/Companies for Hiring of Vehicles (click here) »

Tender for Supply and Installation of SMF Batteries

Sealed Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Original Equipment Manufacturers (OEM) or Traders (Authorised Dealers/Suppliers/Distribut... »

Tender for Setting up of CPE Lab

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Original Equipment Manufacturers or System Integrators for Setting up of CPE Lab at TEC, Ne... »

Date for submission of sealed quotation for the work “Identify & localise the interfering source in 3G N/W in border states of J& K, Gujarat & Punjab” has been extended

Date for submission of sealed quotation for the work   “Identify & localise the interfering source in 3G N/W in border states of J& K, Gujarat & Punjab”  has been extended (click here) »

Sealed quotations are invited for identify & localise the interfering source in 3G N/W

Sealed quotations are invited for identify & localise the interfering source in 3G N/W. (click here) »

Expression of Interest for setting up GREEN PASSPORT LAB PHASE-I in TEC

Sealed detailed proposals and budgetary estimates are invited from reputed T&M solution vendors/Equipment suppliers for above purpose. (click here)                                                  »

NIT for Telecom Security Test lab

NIT for Telecom Security Test lab released. For detail please see www.eprocure.gov.in »

CORRIGENDUM-III

This is regarding BoQ (Price Schedule) in respect of tender No. 2-3/2015-MM/TEC dated 22-09-2015 for procurement of EMF Strength Measuring Instruments and other Devices (Click here) »

CORRIGENDUM-II

This is regarding submission and opening of bids in respect of tender No. 2-3/2015-MM/TEC dated 22-09-2015 for procurement of EMF Strength Measuring Instruments and other Devices. The date for submiss... »

Corrigendum

Corrigendum on TEC Tender No. 2-3/2015/MM/TEC dated 22/09/2015 for procurement of EMF Strength Measuring Instruments (click here )    »

Page 2 of 3123

Oh bother! No topics were found here!

  • It is proposed to hold the combined Sub DCC and Manufacturers Forum Meeting of “IT” division on 19th January, 2016 and 20thJanuary 2016 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following Agenda Items:

    Agenda Items for 19th January 2016 (Forenoon-11.00hrs)

    1. Revision of GR on MPLS-TP based carrier Ethernet Switch for Aggregation and Access Network Applications

    Agenda Items for 19th January 2016 (Afternoon-14.30hrs)

    1. Revision of GR on IVRS    

    Agenda Items for 20th January 2016(Forenoon-11.00hrs)

    1. Revision of GR on VoIP Protocol Analyser
    2. Revision of GR on VoIP Performance Analyser

    Agenda Items for 20th January 2016(Afternoon-14.30hrs)

    1. Revision of IR on Ethernet to E1 converter
    2. Revision of IR on High Speed Line Driver
  • It is proposed to hold a joint Sub-DCC and Manufacturers’ forum meeting on 29th December’2016 at 10.30 AM in the Samwad Committee Room, 3rd Floor, TEC, New Delhi to discuss the following draft GRs:

    1. Installation Accessories and Fixtures for Self-Supporting Metal Free Aerial Optical Fibre Cables
    2. Riser Optical Fibre Cable (For Indoor applications)
  • It is proposed to hold a joint Sub-DCC and Manufacturers’ forum meeting jointly on 30 th November’ 2016 at 11.00 AM in the New Committee Room, 3rd Floor, TEC, New Delhi to discuss the amendment of the following:

    • Existing GR on SMPS Power Plant GR No. TEC/GR/FLA/SMP-001/06.JUL.2010
  • It is proposed to hold a meeting of Sub-DCC and Manufacturers’ forum jointly on 25th October’2016 at 3.00 PM in the Old Committee Room (Manthan), 3rd Floor, TEC, New Delhi to discuss the following draft GR:

     1. Optical Fibre Splicing Machine (Portable) (GR No. TEC/GR/TX/OSM-003/03/XXX-16)

  • Shri G. K. Upadhyay, Member (T) will inaugurate Online Sale of Documents website of TEC.

  • It is proposed to hold the next DCC meeting of the IT division on 17 August 2016 at 11.00 hrs in the conference hall (samwad), TEC New Delhi. The agenda for the meeting is as follows.

    1. Withdrawal of the following GR/IR/SD’s
      1. Wholesale Dial Access Port System GR/WPS-01/01 JUL 2001
      2. Hardware requirements for DOTSOFT GR/DSW-01/03 MAY 2006
      3. Ethernet based DOTSOFT Architecture GR/DWO-01/01 JAN 2004
      4. Multi Service ATM Access Multiplexer GR/DCS-05/04 JAN 2005
      5. ATM Core Switch GR/ATM-01/04 FEB 2005
      6. IR on ATM Access Equipment connecting to DTS ATM network No IR/ATM-03/02 JAN 2005
      7. IR on Frame Relay Access Service No IR/DCS-01/03 SEP 2004
      8. ATM/Frame Relay Protocol Analyser GR/DCA-17/02 FEB 2002
      9. ATM Performance Analyser GR/DCS-06/02 AUG 2004
      10. Standard on NMS No SD/NMS-002/01 FEB 2005
    2. New GR on MPLS SDN Router (TEC/GR/IT/TCP-006/01/XXX-16) 
    3. Revision of GR on eMS platform for NGN (TEC/GR/IT/NMS-001/01/MAR-09)
    4. Revision of GR on Call Center (TEC/GR/IT/CLC-01/03/MAR- 2011)
  • It is proposed to hold a Manufacturers’ forum meeting on 10th August’2016 at 2.30 PM in the Samwad Room, 3rd Floor, TEC, New Delhi to discuss the following draft GR:

     1. Installation Accessories and Fixtures for Self-Supporting Metal Free Aerial Optical Fibre Cables (GR No. GR/OAF-01/02. JULY 2005)

  • DCC meeting of NGS division will be held on 10 August,2016 from 10:30 Hrs. in Samvad Room (New Committee room), 3rd floor, Kurshid Lal Bhawan, Janpath, New Delhi. In this meeting following documents shall be discussed –

    1. IP-PABX with Media Gateway  –  (new GR)
    2. Trunk Media Gateway (TMG)   –  (Review)
    3. Integrated Access Device (IAD)  –  (Review)
  • It is proposed to hold the combined Sub DCC and Manufacturers Forum Meeting of “IT” division on 26th of July, 2016 and 27th July 2016 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the following

    Agenda Items: Agenda Items for 26th of July, 2016

    1. Revision of GR on eMS platform for NGN (TEC/GR/IT/NMS-001/01/MAR-09)

    2. Revision of GR on Call Center (TEC/GR/IT/CLC-01/03/MAR- 2011)

    3. Withdrawal of the following GR/IR/SD’s

       1. Wholesale Dial Access Port System GR/WPS-01/01 JUL 2001
       2. Hardware requirements for DOTSOFT GR/DSW-01/03 MAY 2006
       3. Ethernet based DOTSOFT Architecture GR/DWO-01/01 JAN 2004
       4. Multi Service ATM Access Multiplexer GR/DCS-05/04 JAN 2005
       5. ATM Core Switch GR/ATM-01/04 FEB 2005
       6. IR on ATM Access Equipment connecting to DTS ATM network No IR/ATM-03/02 JAN 2005
       7. IR on Frame Relay Access Service No IR/DCS-01/03 SEP 2004
       8. ATM/Frame Relay Protocol Analyser GR/DCA-17/02 FEB 2002
       9. ATM Performance Analyser GR/DCS-06/02 AUG 2004
     10. Standard on NMS No SD/NMS-002/01 FEB 2005 •

    Agenda Items for 27th of July, 2016

    1. New GR on MPLS SDN Router (TEC/GR/IT/TCP-006/01/XXX-16)

  • It is proposed to hold the combined Sub DCC and Manufacturers Forum Meeting of “NGS” division on 20th of July, 2016 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 10.00 AM. 

    In this meeting, following documents shall be discussed:

    1.      GR on Trunk Media Gateway.(Review)
    2.      GR on Integrated Access Device  (Review)
    3.      GR on IP-PABX with Media Gateway  (New GR)
  • It is proposed to hold the DCC Meeting of “IT” division on 2nd of March, 2016 in Samwad Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

    1. Revision of IR on High Speed Line Driver No TEC/IR/ IT/DCA-018/06/Draft 2016
    2. Revision of IR on Ethernet to G.703 Interface converter No. TEC/IR/IT/DCA-020/04/Draft 2016
    3. New GR on Controller, LAN Switches, Carrier Ethernet Switches and Routers for Software Defined Networks [SDN]
    4. New Standard on eMS
    5. New GR on Call center
    6. New GR on Integrated Systems

  • It is proposed to hold the DCC meeting of Transmission Division on 25th of February, 2016 in Samwad Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

    1. Ethernet Traffic Analyzer up to 10G (Hand Held Model)-TEC/GR/TX/ETA-007/01/XXX-15
  • It is proposed to hold the Sub DCC and Manufacturers Forum Meeting of “IT” division on 10th of February, 2016 and 11th February 2016 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

    1. Agenda Items for 10th February 2016

    Request from the members for proposal for any new GR/IR/SD/SR or revision of any existing document.

    Revision of IR on High Speed Line Driver No TEC/IR/ IT/DCA-018/06/Draft 2016

    Revision of IR on Ethernet to G.703 Interface converter No. TEC/IR/IT/DCA-020/04/Draft 2016

    New GR on Controller, LAN Switches, Carrier Ethernet Switches and Routers for Software Defined Networks [SDN]

    New Standard on eMS

    2. Agenda Items for 11th February 2016

    Request from the members for proposal for any new GR/IR/SD/SR or revision of any existing document.

    New GR on Call center

    New GR on Integrated Systems

     

     

  • It is proposed to hold the DCC meeting of Transmission Division on 18th of November, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. Non-Zero Dispersion Shifted Optical fibre cable (G.655 fibre), TEC/GR/TX/OFC-007/03/xxx-15

     2. High Precision Cleaver for Ribbon Optical Fibre, TEC/GR/TX/OCR-001/03/xxx-15

    3. Hot Jacket Remover for Ribbon Optical Fibre, TEC/GR/TX/OJR-001/03/xxx-15

     

  • It is proposed to hold the DCC Meeting of “IT” division on 29th of October, 2015 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following GR/IRs:

     1. GR on Data Storage

1 2