What's NewTendersLatest Discussion TopicsEvents

Formation of Manufacturers Forum – Future Network Division

FN Division TEC is in the process of forming” Manufacturers Forum”for formulation of lRs/GRs under its mandate / jurisdiction (click here) »

Open Forum for review of router procurement tender document

It is proposed to discuss the tender document for Procurement of Routers and associated materials for  interconnecting RTECs for remote testing with NGN Labs in an Open forum to be held on 29th June 2... »

TEC is in the process of finalizing its Annual Action Plan 2016-2017

TEC is in the process of finalizing its Annual Action Plan 2016-2017. This plan has to be drawn up in pursuance of the role of TEC in helping the telecom industry in formulating various standards and ... »

Standard on IP Interconnection between Service Providers networks released by TEC

TEC has released the standard for IP based interconnection between service providers networks. The standard deal with the requirements for interconnect. Traditionally telecom network interconnection w... »

S&D Division has been redesignated as IoT

The Service and Development (S&D) division  has been redesignated as Internet of Things (IoT) division »

M2M/IoT Technical reports released on 20-11-2015

Release of Technical Reports in M2M domain on 20-11-2015 (click for report) (click for photo) »

Test Procedure for Measurement of Electromagnetic Fields

• Main Test Procedure for Measurement of Electromagnetic Fields form Base Transceiver Stations (For Telecommunication Sector) OCT 2012 (click here) • Amendment of “Test Procedure for measurement of El... »

New GR on Self Supporting Mast

Telecommunication Engineering Centre (TEC) is formulating   a new GR for Self Supporting Mast as per the concept of Everything on Tower (EOT) to provide uniform cost effective solution for Broadband i... »

Budgetary Estimate invite

 A SAR Lab is proposed to be set up at RTEC, Mumbai and Project Estimate is under preparation, hence, RTEC Mumbai invites budgetary estimate from all interested parties (click here for detail) »

Inviting comments from Stakeholders to frame technical audit methodology for assessing domestic value addition under PMA

An interactive session/ meeting on said technical audit methodology has been held on 9th July (Thursday), 2015 with Stakeholders/Vendors/domestic manufacturers of those products. (click here) »

Page 2 of 3123

Tender document for Purchase of Stationary and other Items for TEC

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Reputed Firms/Companies for Procurement of Stationery and other Items (click here) »

Tender for Hiring of Vehicle

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Reputed Firms/Companies for Hiring of Vehicles (click here) »

Tender for Supply and Installation of SMF Batteries

Sealed Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, from Original Equipment Manufacturers (OEM) or Traders (Authorised Dealers/Suppliers/Distribut... »

Tender for Setting up of CPE Lab

Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Original Equipment Manufacturers or System Integrators for Setting up of CPE Lab at TEC, Ne... »

Date for submission of sealed quotation for the work “Identify & localise the interfering source in 3G N/W in border states of J& K, Gujarat & Punjab” has been extended

Date for submission of sealed quotation for the work   “Identify & localise the interfering source in 3G N/W in border states of J& K, Gujarat & Punjab”  has been extended (click here) »

Sealed quotations are invited for identify & localise the interfering source in 3G N/W

Sealed quotations are invited for identify & localise the interfering source in 3G N/W. (click here) »

Expression of Interest for setting up GREEN PASSPORT LAB PHASE-I in TEC

Sealed detailed proposals and budgetary estimates are invited from reputed T&M solution vendors/Equipment suppliers for above purpose. (click here)                                                  »

CORRIGENDUM-III

This is regarding BoQ (Price Schedule) in respect of tender No. 2-3/2015-MM/TEC dated 22-09-2015 for procurement of EMF Strength Measuring Instruments and other Devices (Click here) »

CORRIGENDUM-II

This is regarding submission and opening of bids in respect of tender No. 2-3/2015-MM/TEC dated 22-09-2015 for procurement of EMF Strength Measuring Instruments and other Devices. The date for submiss... »

Corrigendum

Corrigendum on TEC Tender No. 2-3/2015/MM/TEC dated 22/09/2015 for procurement of EMF Strength Measuring Instruments (click here )    »

Page 2 of 3123

Oh bother! No topics were found here!

  • A “SUB DCC cum Manufacturer Forum” meeting of NGS Division is scheduled to be held on 18th JULY, 2017 at 10:00 hrs in Samwad (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following documents shall be discussed.

    (1) Review of GR on “PRIVATE AUTOMATIC BRANCH EXCHANGE”  (GR No. TEC/GR/SW/PBX-CPA/01/FEB-09)

    (2) Review of IR on “PABX FOR NETWORK CONNECTIVITY” (IR No. TEC/IR/SW/PBX-004/03/MAR 2015)

    (3) Review of IR on “SIGTRAN”  (IR no. TEC/IR/SGT-SIG/01/ MAR-09)

  • It is proposed to hold the combined Sub-DCC and Manufacturers Forum Meeting of “IT” division on 11th July, 2017 and 12th July 2017 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following Agenda Items:

    Agenda Items for 11th July, 2017 (Forenoon-11.00hrs)

    1. Revision of IR on IVRS  (Interactive Voice Response System)
    2. Revision of SR on ACS   (Audio Conferencing System)

    Agenda Items for 11th July, 2017 (Afternoon-14.30hrs)

    1. New GR on     NFVCPE (Network Function Virtualization Customer Premises  Equipment)

    Agenda Items for 12th July 2017 (Forenoon 11.00 &   Afternoon-14.30hrs)

    1. Revision of GR on Server.
  • A “SUB DCC cum Manufacturer Forum” meeting is scheduled to be held on 18th May 2017 at 10.00 AM in Samwad (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi.In this meeting following documents shall be discussed as per given schedule

    1. Review of GR on “LAWFUL INTERCEPTION SYSTEMS for PSTN”  (GR No. TEC/GR/SW/LIS-01/03. JUN-10

    2. Review of GR on “Monitoring Equipment for Lawful Interception of PSTN”  (GR No. TEC/GR/SW/LIM-01/03. JAN-11)

    3. Formulation of New GR on “Telephony Application Server” (draft GR no. TEC/GR/SW/TAS-001/01. APR 2017)

  • A DCC (Development Coordination Committee) meeting of NGS division is scheduled to be held on 29 MARCH 2017 at 11 : 00 hrs in ‘SAMWAD’ Room ( New Committee Room ) , 3rd floor, K . L . Bhawan, Janpath, New Delhi . In this meeting following document will be discussed – 
     
    1.GR on “Office in a Box” (In Sub DCC cum MF meeting, name of GR has been changed i.e. now “Integrated Communication & IT System”)

  • A Sub DCC cum MF meeting of NGS division is scheduled to be held on 21st MARCH 2017 at 11:00 hrs. in ‘SAMWAD’ Room (New Committee Room), 3rd floor, K. L. Bhawan, Janpath, New Delhi. In this meeting following document will be discussed-

    GR on “Office IN A BOX”

  • A DCC (Development Coordination Committee) meeting of NGS division is scheduled to be held on 08 MARCH 2017 at 11:00 hrs. in ‘SAMWAD’ Room (New Committee Room), 3rd floor, K. L. Bhawan, Janpath, New Delhi. In this meeting following document will be discussed-

        1. GR on “Office IN A BOX”

  • It is proposed to hold the DCC Meeting of Transmission division on 23/02/2017 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 02.30 PM to discuss the  following Agenda Items:

    1. Installation Accessories and Fixtures for Self-Supporting Metal Free Aerial Optical Fibre Cables TEC/GR/TX/ OAF-001/03/xxx-16
    2. Riser Optical Fibre Cable (For Indoor applications) TEC/GR/TX/OFC-025/01/xxx-16

       

  • It is proposed to hold the DCC Meeting of “IT” division on 22nd of February, 2017 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the  following Agenda Items:

    1. Revision of GR on MPLS-TP based carrier Ethernet Switch for Aggregation and Access Network Applications
    2. Revision of GR on IVRS       
    3. Revision of GR on VoIP Traffic Generator and Protocol/Performance Analyser
    4. Revision of IR on Ethernet to E1 converter
    5. Revision of IR on High Speed Line Driver