Notification for Internship Result
With reference to notification No. 16-11/2015-Pers./TEC dated 19.09.2018, the selected list and waiting list of interns is as follows Selected List Waiting List »
With reference to notification No. 16-11/2015-Pers./TEC dated 19.09.2018, the selected list and waiting list of interns is as follows Selected List Waiting List »
Click here for detail The Last Date for submission of papers has been extended upto 24.12.2019. »
Adoption of TSDSI transposed Standards of 3GPP Standards (402 Nos.) into National Standards by Telecommunications Engineering Centre (TEC) – Inviting the public comments thereupon Telecommunications E... »
It is proposed to hold Manufacturers’ forum meeting on 01.11.2019 at 11:00 AM in the New Committee Room, 3rd floor, TEC…….. (Click here for detail) »
The website of Telecom Engineering Centre (TEC) under Department of Telecommunications has been hosted under domain name www.tec.gov.in. Some security issues have been ……. (Click here for ... »
(Click here for detail) »
Artificial Intelligence (AI) is transforming the role of ICT in decision making through the use of data-driven models that can impact people in all walks of life…. (Click here for detail) »
Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Reputed, Experienced and financially sound IT/Networking/System Integrator companies for Su... »
Kindly refer to earlier notice no. TEC/TS/SECURITY Lab/F-33/2012(pt.) dated 26.09.19 regarding submission of Budgetary quotes for establishment of Security Test lab at TEC, New Delhi. In this regard, ... »
Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from Reputed, Experienced and financially sound IT/Networking/System Integrator companies for Su... »
Kindly refer to earlier notice no. TEC/TS/SECURITY Lab/F-33/2012(pt.) dated 26.09.19 regarding submission of Budgetary quotes for establishment of Security Test lab at TEC, New Delhi. In this regard, ... »
The licensing cell (AS cell) of the Department of Telecommunications, India has issued various licenses under UASL, Basic Service and CMTS categories to various operators for provision and expansion o... »
Sealed quotations are invited by TEC for printing of TEC Newsletters on quarterly basis for one year. (Click here for detail) »
Tenders are invited by Advisor , Telecom Engineering Centre (TEC), on behalf of President of India, from reputed firms/companies for Comprehensive Maintenance Contract of Computer Systems,…. (c... »
TEC is in the process of reviewing the tender document of Security test lab. Hence, inputs are invited from all interested bidders in the tender document (Attached along). Please peruse the attached d... »
Tenders are invited by Sr. DDG, Telecom Engineering Centre (TEC), on behalf of President of India, only from for Setting up of Green Passport Lab, Phase-I (click here for detail) »
“Telecommunications Engineering Centre, Khurshid Lal Bhawan, Janpath, New Delhi – 110001 invites sealed quotations in Two-Bid system (Technical and Financial) from ISO Certification Bodies Duly ... »
Sealed quotations are invited by TEC for Hiring of Audio Conference Bridge Services for conducting Audio-Conferencing Conversations and sharing of documents, among the officers of TEC and other partic... »
टेलीकॉम इंजीनियररंग सेंटर (दूरसंचार विभाग) द्वारा 400 की संख्या में पत्रिका “संचारिका” की छपतई हेतु कोटेशन बन्द लिफाफे में आमंत्रित किये जाते हैं । पत्रिका का प्रारूप निम्नानुसार होगा । (यहाँ क्लिक कर... »
Oh bother! No topics were found here!
It is proposed to hold the DCC Meeting of “IT” division on 28th March, 2018 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 10.30 AM to discuss the following Agenda Items:
It is proposed to hold the DCC Meeting of “IT” division on 14th March, 2018 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the following Agenda Items:
It is proposed to hold a joint Sub-DCC and Manufacturers’ forum meeting of IT division on 30th January’ 2018 at 11 AM in the Samwad Committee Room, 3rd Floor, TEC, New Delhi to discuss the following draft GRs:
A “Sub DCC cum Manufacturer Forum” meeting of NGS division is being scheduled to be held on 29th JANUARY, 2018 at 10 : 00 hrs . in ‘SAMWAD’Room ( new Committee Room ) , 3rd floor, TEC, K . L . Bhawan, Janpath, NewDelhi . In this meeting following Documents will be discussed –
1) IR on NETWORK-NETWORK INTERFACE for Session Border Controller (SBC)(review)
2) GR on “SESSION BORDER CONTROLLER ” (review)
It is proposed to hold a DCC meeting of Radio on 16th January’ 2018 at 11 AM in the Samwad Committee Room, 3rd Floor, TEC, New Delhi to discuss the following draft GRs:
i. Mobile Radio Trunking Communication Equipment (No. :TEC/RS/IR/ MRT-001/01/DRAFT-17)
ii. Mobile Radio Trunking Subscriber Unit (No.: TEC/RS/IR/MRT-002/02/DRAFT-17
It is proposed to hold a joint Sub-DCC and Manufacturers’ forum meeting on 12th January’2018 at 11 AM in the Samwad Committee Room, 3rd Floor, TEC, New Delhi to discuss the following draft GRs:
It is proposed to hold the DCC Meeting of “Radio” division on 15/12/ 2017 in SAMWAD Committee Room, 3rd Floor, TEC, New Delhi at 10.30 AM to discuss the following Agenda Items:
i. Mobile Radio Trunking Communication Equipment (No. :TEC/RS/IR/ MRT-001/01/DRAFT-17)
ii. Mobile Radio Trunking Subscriber Unit (No.: TEC/RS/IR/MRT-002/02/DRAFT-17)
It is proposed to hold the DCC Meeting of “IT” division on 12th of October, 2017 in New Committee Room, 3rd Floor, Telecom Engineering Centre, New Delhi at 11.00 AM to discuss the following Agenda Items:
A DCC (Development Coordination Committee) meeting of NGS division is being scheduled to be held on 13th September, 2017 at 14:30 hrs. in ‘SAMWAD’ Room (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following GR/IR will be discussed-
(1) GR on “PRIVATE AUTOMATIC BRANCH EXCHANGE” (GR No. TEC/GR/SW/PBX-CPA/01/FEB-09)
A “Sub DCC cum Manufacturer Forum” meeting of NGS division is being scheduled to be held on 30th August, 2017 at 14:30 hrs. in ‘MANTHAN’ Room (Old Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following GR will be discussed-
GR on “PRIVATE AUTOMATIC BRANCH EXCHANGE” (GR No. TEC/GR/SW/PBX-CPA/01/FEB-09)
A DCC (Development Coordination Committee) meeting of Transmission division is being scheduled to be held on 25th August, 2017 at 11:00 hrs. in ‘SAMWAD’ Room (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following GR/IR will be discussed-
(1) GR on Multi-service Optical Transport Network (OTN) Platform with DWDM Bearer Transport System for Metro and Core Network Application (TEC/GR/TX/OTN-001/02/XXX-17)
A SUB DCC cum Manufacturer Forum” meeting of FN Division is scheduled to be held on 18th August, 2017 at 02:30 hrs in Samwad (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following documents shall be discussed.
(1) GR document on “Electronic Telephone Instrument” (GR no. TEC/GR/CP/TEL-002/05/JAN-10)
A DCC (Development Coordination Committee) meeting of NGS division is being scheduled to be held on 17th August, 2017 at 10:30 hrs. in ‘SAMWAD’ Room (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following GR/IR will be discussed-
(1) GR on “PRIVATE AUTOMATIC BRANCH EXCHANGE” (GR No. TEC/GR/SW/PBX-CPA/01/FEB-09)
(2) IR on “PABX FOR NETWORK CONNECTIVITY” (IR No. TEC/IR/SW/PBX-004/03/MAR 2015)
(3) IR on “SIGTRAN” (IR no. TEC/IR/SGT-SIG/02/ JAN-12)
It is proposed to hold a joint Sub-DCC and Manufacturers’ forum meeting on 11th August’2017 at 11 AM in the Samwad Committee Room, 3rd Floor, TEC, New Delhi to discuss the following draft GR:
A “SUB DCC cum Manufacturer Forum” meeting of NGS Division is scheduled to be held on 18th JULY, 2017 at 10:00 hrs in Samwad (New Committee Room), 3rd floor, TEC, K. L. Bhawan, Janpath, New Delhi. In this meeting following documents shall be discussed.
(1) Review of GR on “PRIVATE AUTOMATIC BRANCH EXCHANGE” (GR No. TEC/GR/SW/PBX-CPA/01/FEB-09)
(2) Review of IR on “PABX FOR NETWORK CONNECTIVITY” (IR No. TEC/IR/SW/PBX-004/03/MAR 2015)
(3) Review of IR on “SIGTRAN” (IR no. TEC/IR/SGT-SIG/01/ MAR-09)