| Technologies
Covered |
 |
| Telecom
Specification |
 |
|
Dated:
18-02-2010
-----------------------------------------------------------------------------------------------------------------------------------------
Division: MOBILE
MNP related information.
1. TEC Presentation. (click)
2. Provisional
Acceptance Testing (AT) Plan for MNP Service.(click)
3. Minutes
of Meeting with MNP Stakeholders.(click)
4. Corrigendum to
Minutes of Meeting with MNP Stakeholders.(click)
5. Comments on
IVTP & IOTP.(click)
Dated:
15-02-2010
-----------------------------------------------------------------------------------------------------------------------------------------
Division: CAB
Testing and Certification of Telecom
Products.
1. Test
Schedule & Test Procedure (TSTP) for 2 Wire Interface between
Terminal Equipment and PSTN .(click)
2. Test Schedule &
Test Procedure (TSTP) for Electronic Telephone Instrument.(click)
3. Test Schedule & Test
Procedure (TSTP) for V.90 Modem.(click)
4. Test Schedule & Test
Procedure (TSTP) for V.92 Modem.(click)
5. Test Schedule & Test
Procedure (TSTP) for Group 3 FAX Machine/Card.(click)
Dated 22-10-2009
Testing &
Certification of Telecom Products
Test
Schedule & Test Procedure (TSTP) of Mobile Handset for
Identification of Conformity Assessment Bodies (CABs)
Dated:
18-12-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division:
Information Technology
Date of Meeting : 22-12-2009
A
combined Manufacturers Forum & DCC Sub-Committee Meeting is
scheduled to
be held on 22-12-2009
(Tuesday) at 11.00 hrs. in Old committee room, 3rd
floor, K.L.Bhawan. (click
here for
detail)
Dated:
15-12-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division:
Network
Date of Meeting : 18-12-2009
A DCC Meeting is scheduled to
be held on 18-12-2009, at 11.00 hrs. in New Committee room, 3rd
floor,
K.L.Bhawan. (click
here for
detail)
Dated: 07-12-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division:
Information Technology
Date of Meeting : 15-12-2009
A
DCC Sub-Committee Meeting is scheduled to
be held on 15-12-2009 (Tuesday) at 11.00 hrs.
in Old committee room, 3rd
floor, K.L.Bhawan.
(click
here for
detail)
Dated: 26-11-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division:
Network
Date of Meeting : 01-12-2009
A Manufacturer Forum is scheduled to
be held on 01-12-2009 at 11.00 hrs. in Old Committee Room,
3rd
floor, K.L.Bhawan.
(click
here for
detail)
Dated 20-11-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Radio
Template on "General Electromagnetic
Compatibility Requirements for Telecommunication Equipment"
No.
TBRR/F/GQR-GN/33.TEC/2004 (Part). Dt/16.03.2009.
(click
here for
detail)
Dated 16-09-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Service Application
Date of Workshop : 27-11-2009
The IVth Workshop on "Migration
from IPv4 to IPv6 in India" will be held on 27nd Novtember 2009, at
Mumbai.
(click
here for
detail)
Dated 22-10-2009
Testing &
Certification of Telecom Products
Test
Schedule & Test Procedure (TSTP) of Mobile Handset for
Identification of Conformity Assessment Bodies (CABs)
Dated 16-09-2009
The TEC documents price are
revised. The price revision will be effective from 1st October, 2009.
(click here
for
detail)
Dated 07-09-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Service Application
Date of Workshop : 15-09-2009
The 2nd Workshop on "Migration
from IPv4 to IPv6 in India" will be held on 15th September 2009, at
Prof. Satish Dhawan Auditorium, Indian Institute of Science, Bangalore.
(click here
for
detail)
-----------------------------------------------------------------------------------------------------------------------------------------
Dated 30-07-2009
Limited
Tender for supply of Cartridges for Printers / All-in-one
machines
of Samsung make.
-----------------------------------------------------------------------------------------------------------------------------------------
Dated:
02-07-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Division: Service Application
Date of Workshop : 17-07-2009
TEC organised workshop on IPv6 on 21-07-2009. (click here for
detail)
Dated:
25-02-2009
-----------------------------------------------------------------------------------------------------------------------------------------
Following officers of TEC have been appointed
as Editors by ITU-T
for Draft Y.phy_arch_ngn-"architectural realizations and open
interfaces in NGN"
1. Shri R.K. Siddhartha, Director(SA-II)
2. Shri Rajeshwar Dayal, Direcor(M-I)
The officers had submitted the contribution no.C-64 as a base line text
for the draft recommendation in January meeting of ITU-T SG13, held at
Geneva, Switzefland.
|
|