Draft Technical Report on "Direct Broadcasting to Mobile Handheld Devices (Ver 3.0)"
21-02-2024
29-02-2024
2
DCC meeting on TEC standard for Draft GR on “Hybrid Set-Top Box (STB) with support for Ultra High Definition (UHD) and Virtual Reality (VR)
20-02-2024
28-02-2024
3
Draft GR on Hybrid Set-Top Box (STB) with support for Ultra High Definition (UHD) and Virtual Reality (VR)
22-01-2024
05-02-2024
4
Extension of Timeline for submitting responses/ comments/inputs on the draft technical report on “Television Broadcasting to Mobile Handheld Devices - D2M Broadcasting”
18-01-2024
31-01-2024
5
Inviting inputs on Draft Technical Report on Direct Broadcasting to Mobile Handheld Devices
29-12-2023
31-01-2024
6
TEC invites inputs on Standard for Assessing & Rating Robustness of AI Systems in Telecom Networks and Digital Infrastructure
18-10-2023
15-11-2023
7
Revision of GR of Network Time Protocol Server
09-10-2023
16-10-2023
8
Revision of GR of Precision Time Protocol-Slave Clock
09-10-2023
16-10-2023
9
Revision of GR of Precision Time Protocol-GrandMaster
09-10-2023
16-10-2023
10
Inviting inputs on draft technical report on "Television Broadcasting to Mobile handheld devices - Direct to Mobile (D2M) broadcasting
21-08-2023
08-09-2023
11
Draft Standard on "Metal free Ribbon Optical Fibre Cable with Double HDPE Sheath for underground duct application(Type-I & Type-II)" (Standard No. TEC 85241:2023)
10-02-2023
19-02-2023
12
Draft Standard on "Metal free Optical Fibre Cable with Double HDPE Sheath for underground duct application(Type-I & Type-II)" (Standard No. TEC 85240:2023)
10-02-2023
19-02-2023
13
Draft Standard for "Radio over Fibre"
25-01-2023
12-02-2023
14
Interface Requirements for Non Geostationary satellite orbit (NGSO) based communication networks
27-12-2022
12-01-2023
15
Inviting comments on the draft Telecom Rules pertaining to Section 23 (Power to prescribe standards) of draft Indian Telecommunication Bill, 2022 of DoT
30-12-2022
01-02-2023
16
Draft Standard for assessing and rating Artificial Intelligence Systems for fairness
29-12-2022
13-02-2023
17
Draft Test Guide for Quantum Key Distribution System as per the TEC GR No.: 91000:2022 (Deadline for submission of stakeholder comments on email to adgqt.tec-dot@gov.in is 10 Jan 2023)
27-12-2022
10-01-2023
18
Audio-Visual content Accessibility Roadmap for India
16-11-2022
15-12-2022
19
Discussion Paper on ‘Radio Frequency (RF) Electromagnetic Field (EMF) Compliance Assessment of 5G Base Stations'
09-11-2022
31-12-2022
20
Revision/Re-affirmation of Standards for GRs of Tx division
12-09-2022
22-09-2022
21
The stakeholder consultations on Draft ITSAR of 5G SEPP on 11.08.2022
20-07-2022
09-08-2022
22
The stakeholder consultations on Draft ITSAR of 5G SCP on 11.08.2022
20-07-2022
09-08-2022
23
The stakeholder consultations on Draft ITSAR of 5G N3IWF on 11.08.2022
20-07-2022
09-08-2022
24
The stakeholder consultations on Draft ITSAR of 5G NRF is scheduled to be held on 05-08-22
18-07-2022
02-08-2022
25
The stakeholder consultations on Draft ITSAR of 5G NEF is scheduled to be held on 05-08-22
18-07-2022
02-08-2022
26
The stakeholder consultations on Draft ITSAR of 5G NWDAF is scheduled to be held on 05-08-22
18-07-2022
02-08-2022
27
Draft ITSAR of 5G-UDM
08-07-2022
27-07-2022
28
Draft ITSAR of 5G-AuSF
08-07-2022
27-07-2022
29
Draft ITSAR of 5G SMF
08-07-2022
27-07-2022
30
Final draft document on National Plan for Distribution of Indian Standard Time to LSPs of DoT
21-06-2022
23-06-2022
31
Inputs invited on draft National Plan for Distribution of Indian Standard Time to Licensed Service Providers of DoT
03-06-2022
10-06-2022
32
Draft GR of Band Pass Filter
27-05-2022
10-06-2022
33
Notice for Stakeholder consultation User Plane Function(UPF) of 5G
06-05-2022
30-05-2022
34
Notice for Stakeholder consultation on Access and Mobility Management Function(AMF) of 5G
06-05-2022
27-05-2022
35
Draft Essential Requirements of Hybrid Set Top Box
28-04-2022
05-05-2022
36
Draft TSTP of Subscriber Management System (SMS)
25-03-2022
22-04-2022
37
Draft TSTP of Conditional Access System (CAS)
25-03-2022
22-04-2022
38
Draft ER of Hybrid Set Top Box
17-03-2022
25-03-2022
39
Inviting inputs for creating Framework for Fairness Assessment of AI/ML Systems #AIforAll
22-02-2022
25-03-2022
40
Inviting Nominations for “National Study Group on Open RAN”
07-01-2022
15-02-2022
41
Notice for Stakeholder consultation on ITSAR for Cell Broadcast Centre
28-01-2022
18-02-2022
42
Inviting comments on the Revised Draft TSTP of Conditional Access System (CAS) and Subscriber Management System (SMS)
11-01-2022
20-01-2022
43
Revised- notice for inviting the public comments on Adoption of TSDSI transposed 3GPP Rel 16 (16.2.0) standards
04-01-2022
03-02-2022
44
Inviting comments on the draft TSTP of Conditional Access System (CAS) and Subscriber Management System (SMS)
27-12-2021
07-01-2022
45
Notice for inviting comments and Sub-DCC & MF meeting of FA divison in respect of revision of Standard for ECR and EP
17-12-2021
03-01-2022
46
Notice for Stakeholder consultation on ITSAR for ISDN CPE(MCU) and draft ITSAR document
06-12-2021
23-12-2021
47
5G/5Gi trials test schedule and test procedure
29-10-2021
04-11-2021
48
Inviting the Public comments on Adoption of TSDSI transposed standards for 3GPP Release-15 into national standards by TEC
29-07-2021
28-08-2021
49
Draft ER of Router
24-05-2021
31-05-2021
50
Draft ER of COTS Server
19-05-2021
30-06-2021
51
Draft ER of Infiniband Switch
19-05-2021
31-05-2021
52
Inviting comments on the draft ER of IP Multimedia Conferencing Equipment
28/10/2020
08/11/2020
53
Online meeting to discuss Wi-Fi Access Point (AP) (TEC/GR/RS/WFS-003/10.XXX
2020